Heritage Road, Lafayette Ave, Jefferson Ave and Upland Way Stormwater Improvements
     Plans
         Construction Schedule as of 8/13/21
         Letter to Residents
                 Heritage - Removal of approximately 1,200 linear feet of existing stormwater pipe and replacement with 36" diameter reinforced concrete pipe.  Replacement of 4 existing inlet structures with new Type B structures.  The installation of an additional 5-Type B and 6-Type Double B structures.  The limits of the work are from WArwick Road to a point approximately 300 linear feet east of Washington Ave and select location at a point approximately 200 linear feet east of Atlantic Ave.

                  Lafayette/Jefferson - Removal of approsimately 150 linear feet of existing stormwater pipe and replacement with 24" diameter reinforced concrete pipe.  The installation of an additional 400 linear feet of 24" diameter reinforced concrete pipe.  Replacement of an existing inlet structure with new Type Double B structure.  The installation of an additional 5-Type Double B structures.  The limits of the work are from Jefferson Ave to Atlantic Ave.

                  Upland - Removal of approximately 150 linear feet of existing stormwater pipe and replacement with 18" diameter reinforced concrete pipe.  The installation and refurbishment of 5-Type Double B structures.  The limits of the work are generally located near the PATCO underpass.
         Letter to residents
         Schedule of work
         Resolution of Award
         Project Dashboard 7/27/21

Atlantic Ave Outfall Replacement
       Project Dashboard 7/27/21


Homestead Ave Drainage Improvements
         Project Dashboard 7/27/21
     

2019

CIPP Stormwater Pipe Improvements
      Cured-in-place pipe (CIPP) lining is an effective method to rehabilitate storm lines without excavation.  CIPP involves the use of a resin lining material that is inserted into the pipe.  The resin looks like a stocking.  The liner or "stocking" is heated and it expands to line the interior of the storm pipe.  This creates a new long-term, structural pipe with no disturbance to the ground surface or landscape above the pipe.

      Resolution of Award
      Letter to residents of Knolltop
      Letter to residents affected on South Edge Park Lane
      Letter to residents affected between Lake St and Euclid Ave
      Schedule of work